Rising KashmirRising KashmirRising Kashmir
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search

Archives

  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Anchor
  • Breaking
  • Business
  • City
  • Developing Story
  • Editorial
  • Education
  • Features
  • Health
  • Interview
  • Jammu
  • Jammu and Kashmir News
  • Kashmir
  • Kashmir Tourism
  • Kath Bath
  • National
  • Opinion
  • Politics
  • Sports
  • Technology
  • Top Stories
  • Trending
  • Uncategorized
  • Video
  • Viewpoint
  • World
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Frustration grows as Natipora-Nowgam road remains in shambles
Share
Notification Show More
Font ResizerAa
Rising KashmirRising Kashmir
Font ResizerAa
  • Home
  • Top Stories
  • News
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Follow US
© 2024. All Rights Reserved.
Rising Kashmir > Blog > City > Frustration grows as Natipora-Nowgam road remains in shambles
City

Frustration grows as Natipora-Nowgam road remains in shambles

Commuters, locals express frustration, demand fast-track repair

M Haziq Pandit
Last updated: June 26, 2025 12:05 am
M Haziq Pandit
Published: June 26, 2025
Share
4 Min Read
SHARE

Srinagar, June 25: The deteriorating condition of the Natipora–Nowgam road continues to be a source of growing frustration for both commuters and residents. Despite repeated appeals for repair and macadamisation, the stretch remains in a dilapidated state, causing daily inconvenience.

The nearly four-kilometre stretch, connecting key localities such as Natipora, Naikbagh and Nowgam, has long been a vital link in the city’s southern transit network. However, years of neglect have left the road riddled with potholes and uneven surfaces, making daily commutes a struggle for locals.

Residents and daily commuters have expressed their frustration over the poor condition of the road. Zubair Ahmad, a daily commuter, said: “I have been driving on this road for years, and the situation just keeps getting worse. It’s frustrating, especially when you’re running late. The risk of an accident is high, and it’s only a matter of time before something serious happens.”

Faisal Bhat, another commuter, added, “Two-wheeler riders have it the worst. I’ve had several near-miss accidents here, and I’m not alone. People try to avoid potholes, but it’s hard to do that when the entire road is full of them.”

Ashraf Mir, a local resident, said, “I have seen cars getting stuck in the potholes more times than I can count. And it’s not just a minor inconvenience — there’s always a danger of cars skidding out of control because of the uneven surfaces.”

The situation worsens during rainfall, when water fills the potholes, making the road even more treacherous. This not only contributes to traffic snarls but also increases the likelihood of accidents.

“The road becomes nearly impassable when it rains,” said Rouf Wani, a local resident. “Water fills up the potholes, and even walking becomes a challenge. It’s only a matter of time before someone gets hurt trying to avoid these water-filled craters.”

Despite repeated appeals and complaints, locals claim that no significant action has been taken to address the issue. “We first appealed for repairs back in 2016, then again in 2017, and even as recently as early 2025,” said Junaid Shah, a local resident. “Each time, we were assured that the road would be fixed, but nothing has been done. It feels like we’re just being ignored, while the road continues to deteriorate. We urge the authorities to look into the issue immediately and take prompt action. The road is becoming increasingly dangerous, and it’s only a matter of time before a major incident occurs.”

Responding to these concerns, Chief Engineer of Roads and Buildings, Sajad Naqeeb, acknowledged the issue, stating that tenders for the repair and macadamisation of the road have already been floated. “We are aware of the poor condition of the road, and the necessary steps are being taken to address it. The tenders for macadamisation have been floated, and we expect the work to be completed as soon as possible. We urge the public to remain patient during the ongoing process,” Naqeeb said. As residents and commuters continue to grapple with the poor road conditions, they remain hopeful that the promised repairs will be carried out soon, ensuring safer travel for all.

CM holds pre-budget consultation with public representatives
Officer Trainees of ICLS conclude Bharat Darshan at Srinagar
SKUAST-K holds entrance test for basic horticulture training course 
Fire incidents surge despite safety awareness programs, locals call for better preparedness
Condolence meeting held at SKUAST-K to pay homage to departed medical assistant

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Copy Link Print
Previous Article Over 65 students from Ladakh evacuated from Iran under ‘Operation Sindhu’
Next Article Students deserve access to quality education: Edu minister
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

1MFollowersLike
262kFollowersFollow
InstagramFollow
234kSubscribersSubscribe
Google NewsFollow

Latest News

Defence Minister Rajnath Singh highlights terrorism’s threat to world at SCO meeting in China
Breaking National
June 26, 2025
Operation Sindhu: 275 evacuees from Iran reach Delhi
Breaking National
June 26, 2025
DU may drop papers on Pakistan, China, Islam in Political Science PG syllabus; teachers object
Breaking National
June 26, 2025
Trump says US-Iran talks likely next week, claims “destroyed” Iran’s nuclear program
Breaking World
June 26, 2025

Recent Posts

  • Defence Minister Rajnath Singh highlights terrorism’s threat to world at SCO meeting in China
  • Operation Sindhu: 275 evacuees from Iran reach Delhi
  • DU may drop papers on Pakistan, China, Islam in Political Science PG syllabus; teachers object
  • Trump says US-Iran talks likely next week, claims “destroyed” Iran’s nuclear program
  • India will not hesitate to target epicentres of terrorism : Defence Minister at SCO meet in China

Recent Comments

  1. Shah on Relief for Employees: J&K Bank Fixes EMI-Credit Mismatch, says JK Bank Chairman
  2. Latif khan on Why Kashmir needs Stronger Private Healthcare and Health Insurance
  3. Sameer farooq mir on Qazi Irfan assumes charge as RTO Kashmir
  4. Captain Vikrama on CM Omar Abdullah hails historic feat as three Kashmiri Girls crack IIT-JEE Advanced
  5. BASHIR AHMAD BHAT on Poor hotel accommodation, lack of medical facilities irk Kashmiri pilgrims in Saudi Arabia, video goes viral

Contact Us

Flat No 7,Press Enclave, Srinagar, 190001
0194 2477887
9971795706
[email protected]
[email protected]

Quick Link

  • E-Paper
  • About Us
  • Contact Us

Top Categories

Stay Connected

1.06MLike
262.5kFollow
InstagramFollow
234.3kSubscribe
WhatsAppFollow
Rising KashmirRising Kashmir
Follow US
© 2025. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?