Rising KashmirRising KashmirRising Kashmir
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search

Archives

  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Anchor
  • Breaking
  • Business
  • City
  • Developing Story
  • Editorial
  • Education
  • Features
  • Health
  • Interview
  • Jammu
  • Jammu and Kashmir News
  • Kashmir
  • Kashmir Tourism
  • Kath Bath
  • National
  • Opinion
  • Politics
  • Sports
  • Technology
  • Top Stories
  • Trending
  • Uncategorized
  • Video
  • Viewpoint
  • World
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Vande Bharat Express trial run brings Kashmir closer to national network
Share
Notification Show More
Font ResizerAa
Rising KashmirRising Kashmir
Font ResizerAa
  • Home
  • Top Stories
  • News
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Follow US
© 2024. All Rights Reserved.
Rising Kashmir > Blog > Top Stories > Vande Bharat Express trial run brings Kashmir closer to national network
Top Stories

Vande Bharat Express trial run brings Kashmir closer to national network

Train equipped with winter-ready features for Kashmir’s harsh climate: CAM

Irfan Yattoo
Last updated: January 26, 2025 2:02 am
Irfan Yattoo
Published: January 26, 2025
Share
6 Min Read
SHARE

Srinagar, Jan 25: The Vande Bharat Express successfully conducted its maiden trial run between Katra and Budgam on Saturday, marking a historic milestone in enhancing connectivity between Kashmir and the rest of India’s railway network.
The high-speed train, equipped with state-of-the-art facilities designed to withstand the region’s harsh winters, promises to revolutionize travel, shorten journey times, and foster economic growth in Kashmir.
Chief Area Manager (CAM) Kashmir, Saqib Yousuf Yatoo (IRTS), told Rising Kashmir that the Vande Bharat Express completed its trial run between Katra and Budgam stations on Saturday.
“It was a successful trial, and we expect regular services to begin soon, connecting Kashmir with other parts of India,” he said.
Saqib emphasized that the project is part of Prime Minister Narendra Modi’s ‘Make in India’ vision. The Vande Bharat Express, an indigenous train, is equipped with modern features tailored to the region’s unique climatic conditions.
“This is the first time the train has arrived in Kashmir, and passengers will experience a comfortable journey without any issues,” he added.
Regarding the official inauguration, Saqib mentioned, “We are currently conducting trials, and the results will be analyzed before a final decision is made.”
The train arrived at Srinagar Railway Station in Nowgam at 11:30 a.m., where it was greeted with applause, slogans, and garlands by a large crowd of railway officials and locals. After a brief stop, it continued to Budgam station to conclude its trial run.
Train Manager Raj Kumar also hailed the trial run as a success and a historic day for Jammu and Kashmir. “Now, the people of Kashmir can easily connect to any part of India through the railway network,” he said.
Kumar highlighted that the Vande Bharat rake has been specially designed for Kashmir’s severe winters, featuring heating pads to prevent freezing and windshields equipped with anti-frost technology.
The train departed from Delhi on January 24 and arrived in Jammu by afternoon, where it halted overnight. The trial run began from Katra Railway Station at 8 a.m. and reached Srinagar Railway Station by 11 a.m., covering over 150 kilometers in just three hours. The usual six-to-eight-hour journey from Jammu to Srinagar, due to mountainous terrain and sharp bends, was drastically reduced, thanks to the Udhampur-Srinagar-Baramulla Rail Link (USBRL).
This 272-kilometer railway project connects Kashmir to the national railway network, offering a faster and more efficient mode of travel.
The official inauguration of the train service is expected next month, likely by Prime Minister Narendra Modi, following the Delhi Assembly elections.
Locals expressed their excitement and optimism about the Vande Bharat Express. Many saw it as a transformative step for better connectivity and economic growth in the region.
Fayaz Ahmad, a resident of Anantnag, said, “This special train will make travel much easier and bring more tourists to the Valley, benefiting our economy.”
“With improved connectivity, trucks carrying fruits can reach markets across India faster, ensuring freshness and better prices,” he added.
Mohammad Aquib, a student from Baramulla studying outside J&K, said, “The Vande Bharat Express will save us a lot of time. Earlier, traveling out of the Valley was exhausting, but now we can travel directly without much hassle. It’s a huge relief for students like me.”
The USBRL, constructed at an estimated cost of ₹41,000 crore, traverses some of the world’s most challenging terrains, including the iconic Chenab Bridge—a steel structure soaring 1,178 feet above the river, surpassing the height of the Eiffel Tower. The route also includes over 100 kilometers of tunnels carved through the mountains.
The train originally departed from Shakoor Basti Railway Station in New Delhi on January 24, reaching Jammu Tawi Railway Station at 3:20 p.m. It resumed its journey the following morning from Katra, navigating through mountainous terrain to Srinagar.
According to Northern Railways, while other Vande Bharat trains operate at speeds of up to 160 km/h, this train is currently restricted to 85 km/h due to safety considerations. Speeds are expected to increase gradually as the track stabilizes with regular operations.
To meet the demands of Jammu and Kashmir’s sub-zero temperatures, the Vande Bharat train is equipped with advanced heating systems for bio-toilet tanks, warm air for the vacuum system, and optimized air-brake functionality. Embedded heating elements in the windshields prevent frost accumulation, ensuring clear visibility for operators.
In addition to these enhancements, the train features standard Vande Bharat amenities, including fully air-conditioned coaches, automatic plug doors, and mobile charging sockets.
Over the past month, multiple trial runs have been conducted on critical sections, including the Anji Khad cable-stayed bridge and the iconic Chenab Arch Bridge at Kauri.
The Anji Khad Bridge, a single-pylon cable-stayed structure rising 331 meters above the riverbed, is a testament to engineering excellence. Spanning 473.25 meters, it is one of the highest railway bridges in the world, alongside the Chenab Arch Bridge, which holds the record as the tallest at 359 meters—35 meters higher than the Eiffel Tower.

 

Protected Areas and Wetland Reserves declared off-limits
Annual Amarnath Yatra set to commence on June 29
Centre declares Masarat Alam’s MLJK as ‘unlawful association’ under UAPA 
CS appreciates officers’ for successful G20 meet
GoI allocates Rs 15 cr to J&K for boosting forest, tree cover

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Copy Link Print
Previous Article 76th Republic Day: No restrictions on public movement today: Officials
Next Article Sr. Commandant AP Singh awarded Police Medal for meritorious service
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

1MFollowersLike
262kFollowersFollow
InstagramFollow
234kSubscribersSubscribe
Google NewsFollow

Latest News

Journalism students visit Rising Kashmir office for industry exposure
City
May 23, 2025
Footpath encroachments outside SKIMS Soura ‘disrupt’ emergency services
City
May 23, 2025
MRCS&G SKUAST-K unveils vision 2030 document
Kashmir
May 23, 2025
Sakeena Itoo tours Chanapora constituency
City
May 23, 2025

Recent Posts

  • Journalism students visit Rising Kashmir office for industry exposure
  • Footpath encroachments outside SKIMS Soura ‘disrupt’ emergency services
  • MRCS&G SKUAST-K unveils vision 2030 document
  • Sakeena Itoo tours Chanapora constituency
  • Integrated Command & Control Centre made operational at Vaishno Devi Shrine

Recent Comments

  1. SavePlus on AI and Behavioural Analytics in Gaming: Making the World of Gaming Better
  2. Parul on Govt acknowledges faulty streetlights on Narbal-Tangmarg road
  3. dr gora on Women Veterinarians and the Goal of Viksit Bharat
  4. jalwa game login on National Education Policy 2020: Transforming India’s Educational System
  5. Virender Bhat on Pahalgam Attack: A War on Humanity, Peace, and Kashmiriyat

Contact Us

Flat No 7,Press Enclave, Srinagar, 190001
0194 2477887
9971795706
[email protected]
[email protected]

Quick Link

  • E-Paper
  • About Us
  • Contact Us

Top Categories

Stay Connected

1.06MLike
262.5kFollow
InstagramFollow
234.3kSubscribe
WhatsAppFollow
Rising KashmirRising Kashmir
Follow US
© 2025. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?