Rising KashmirRising KashmirRising Kashmir
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search

Archives

  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Anchor
  • Breaking
  • Business
  • City
  • Developing Story
  • Editorial
  • Education
  • Features
  • Health
  • Interview
  • Jammu
  • Jammu and Kashmir News
  • Kashmir
  • Kashmir Tourism
  • Kath Bath
  • National
  • Opinion
  • Politics
  • Sports
  • Technology
  • Top Stories
  • Trending
  • Uncategorized
  • Video
  • Viewpoint
  • World
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: KPDCL announces power shutdowns for maintenance
Share
Notification Show More
Font ResizerAa
Rising KashmirRising Kashmir
Font ResizerAa
  • Home
  • Top Stories
  • News
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Follow US
© 2024. All Rights Reserved.
Rising Kashmir > Blog > Breaking > KPDCL announces power shutdowns for maintenance
Breaking

KPDCL announces power shutdowns for maintenance

RK Online Desk
Last updated: October 15, 2024 11:26 pm
RK Online Desk
Published: October 15, 2024
Share
7 Min Read
SHARE

According to the Chief Engineer, Distribution, KPDCL, in order to carry out construction of 33KV Pulwama 2nd Circuit under Phase II from 160 MVA GIS Lassipora, the shutdown of 132/ 33 KV GIS Lassipora (160 MVA) shall be observed due to which 33/11KV Receiving Stations at Pulwama, Pinglena, MM Flour Mill, Covid Hospital and Tenghaar shall remain off while the power supply to the areas that will be affected include Pulwama, Tahab, Koil, Pinglena and Tenghar from 10 AM to 05 PM on 17, 19, 21 and 23rd of October, 2024.

Similarly, to carry out the augmentation of 33KV Pampore Pulwama line, the shutdown of AIS Pampore (200 MVA) shall be observed due to which 33/11KV Receiving Station at Kadlabal shall remain off while power supply to the Kadlabal Pampore area shall remain affected from 10 AM to 05 PM on 16th of October, 2024.

Also, in order to carry out the Erection of poles in 11 KV Moshwara feeder (segregation and reconductoring works) under RDSS Works, the shutdown of AIS Kanipora (2×50 MVA) shall be observed due to which 33/11KV Receiving Stations at Kanipora, Keller and Shadimarg shall remain off while power supply to the Keller, Shadimarg, Moshwara and Kanipora areas shall remain affected from 10 AM to 05 PM on 17 and 19th of October, 2024.

Further, to carry out Looping of trees! Branch cutting and other preventive maintenance works of various 33 KV lines, the shutdown of Shariefabad Grid Station shall be observed due to which 33/11KV Receiving Stations at Zainakote, Shalteng and Bakshipora shall remain off while power supply to the Zainakote, Shalteng and Bakshipora areas shall remain affected from 09 AM to 05 PM on 16th of October, 2024.

The shutdown of Wanganpora Grid Station shall be observed due to which 33/11KV Receiving Stations at SH Pora, MR Gunj, Shreen Bagh, Kawdara, and Mughal Masjid shall remain off while power supply to the SH Pora, MR Gunj, Shreen Bagh, Kawdara and Mughal Masjid areas shall remain affected from 09 AM to 05 PM on 19th of October, 2024.

The shutdown of Bemina Grid Station shall be observed due to which 33/11KV Receiving Stations at JVC, PC Depot, SKIMS-JVC and Children Hospital shall remain off while power supply to the Bemina, Parimpora, Children Hospital and JVC areas shall remain affected from 09 AM to 05 PM on 20th of October, 2024.

The shutdown of Bemina Grid Station shall be observed due to which 33/11KV Receiving Stations at Bemina I, Bemina II, Moominabad Court Complex and GIS Batmaloo shall remain off while power supply to the Bemina, Moominabad Court Complex and Batmaloo areas shall remain affected from 09 AM to 05 PM on 20th of October, 2024.

The shutdown of Bemina Grid Station shall be observed due to which 33/11KV Receiving Stations at Karan Nagar and Shalistore shall remain off while power supply to the Karan Nagar area shall remain affected from 09 AM to 05 PM on 19th of October, 2024.

The shutdown of Wanganpora Grid Station shall be observed due to which 33/11KV Receiving Stations at Safakadal and Wanganpora shall remain off while power supply to the Safakadal and Wanganpora areas shall remain affected from 09 AM to 05 PM on 17th of October, 2024.

In order to carry out Shifting of 33 KV line at Thune and Stabilization/ branch cutting along 33 KV Gurez Line, the shutdown of Potshahi Grid Station shall be observed due to which 33/11KV Receiving Stations at Gurez, Peerbaba, Tragbal and NHPC shall remain off while power supply to Gurez shall remain affected from 10 AM to 03 PM on 16 and 19th of October, 2024.

The shutdown of Kangan Grid Station shall be observed due to which 33/11KV Receiving Station at Surfraw shall remain off while power supply to the Gagangeer, Sonamarg and Surfraw areas shall remain affected from 10 AM to 03 PM on 17th of October, 2024.

Similarly, in order to carry out Branch Cutting, the shutdown of Kulgam Grid Station shall be observed due to which 33/11KV Receiving Station at Nillow shall remain off while power supply to the Nillow, Arreh, Begam, Sehpora and Mohdpora areas shall remain affected from 10 AM to 02 PM on 16th of October, 2024.

Also, in order to carry out Improvement/ stabilization of said line from Aishmuqam to RMU Pahalgam by way of replacement of poles with damaged pole tops, the shutdown of 132/ 33 KV Gopalpora Grid Station shall be observed due to which 33/11KV Receiving Stations at Pahalgam, GIS Pahalgam and Batkoot shall remain off while the power supply to the Powerhouse, Army, Hospital Pahalgam A, B &C Batkoot, Laddi and Yenner areas will be affected from 10 AM to 04 PM on 16, 19 and 23rd of October, 2024.

Further, in order to carry out Reconductoring of 33 KV Alusteng Zakura Line from 0.1 ACSR to 0.2 ACSR, the shutdown of Alusteng Grid Station shall be observed due to which 33/11KV Receiving Station at Umerhair shall remain off while power supply to the Ahmednagar, Baspora, (Partially) and Umerhair areas shall remain affected from 11 AM to 04 PM on 19 and 22nd of October, 2024.

China reports more than 12,000 COVID-related deaths from January 13-19: Report
08 gamblers arrested in Kulgam, stake money seized: Police
Lt Governor released J&K Haj Committee’s Coffee Table Book “The Spiritual Journey HAJ”
If Kejriwal is not elected CM in next election, Delhi will see power hike like UP: Atishi
“No plan to provide stipend to unemployed youth”: J&K Govt 

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Copy Link Print
Previous Article J&K records incident free Assembly polls, first time in 3 decades
Next Article Rahul Gandhi to attend Omar Abdullah’s oath ceremony in Srinagar tomorrow
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

1MFollowersLike
262kFollowersFollow
InstagramFollow
234kSubscribersSubscribe
Google NewsFollow

Latest News

Foreign Secretary Vikram Misri, Dy NSA Pavan Kapoor meet US Under Secretary of Defence Elbridge Colby
Breaking National
May 30, 2025
Security stepped up in Poonch ahead of Union Home Minister Amit Shah’s visit
Breaking Jammu and Kashmir News
May 30, 2025
“Excellent discussions”: All-Party delegation wraps up Saudi visit with focus on terrorism and strategic ties
Breaking National
May 30, 2025
Counter Intelligence wing of J-K Police conduct raids across Kashmir valley in terror link case
Breaking Kashmir
May 30, 2025

Recent Posts

  • Foreign Secretary Vikram Misri, Dy NSA Pavan Kapoor meet US Under Secretary of Defence Elbridge Colby
  • Security stepped up in Poonch ahead of Union Home Minister Amit Shah’s visit
  • “Excellent discussions”: All-Party delegation wraps up Saudi visit with focus on terrorism and strategic ties
  • Counter Intelligence wing of J-K Police conduct raids across Kashmir valley in terror link case
  • India’s Purple Revolution to take centre stage at Bhaderwah festival

Recent Comments

  1. BASHIR AHMAD BHAT on Poor hotel accommodation, lack of medical facilities irk Kashmiri pilgrims in Saudi Arabia, video goes viral
  2. sree vishnu movies on Pahalgam attack shatters Kashmir’s film tourism revival
  3. SavePlus on AI and Behavioural Analytics in Gaming: Making the World of Gaming Better
  4. Parul on Govt acknowledges faulty streetlights on Narbal-Tangmarg road
  5. dr gora on Women Veterinarians and the Goal of Viksit Bharat

Contact Us

Flat No 7,Press Enclave, Srinagar, 190001
0194 2477887
9971795706
[email protected]
[email protected]

Quick Link

  • E-Paper
  • About Us
  • Contact Us

Top Categories

Stay Connected

1.06MLike
262.5kFollow
InstagramFollow
234.3kSubscribe
WhatsAppFollow
Rising KashmirRising Kashmir
Follow US
© 2025. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?