Rising KashmirRising KashmirRising Kashmir
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search

Archives

  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Anchor
  • Breaking
  • Business
  • City
  • Developing Story
  • Editorial
  • Education
  • Features
  • Health
  • Interview
  • Jammu
  • Jammu and Kashmir News
  • Kashmir
  • Kashmir Tourism
  • Kath Bath
  • National
  • Opinion
  • Politics
  • Sports
  • Technology
  • Top Stories
  • Trending
  • Uncategorized
  • Video
  • Viewpoint
  • World
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: North India’s first Nuclear Plant coming up in Haryana: Dr Jitendra
Share
Notification Show More
Font ResizerAa
Rising KashmirRising Kashmir
Font ResizerAa
  • Home
  • Top Stories
  • News
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Follow US
© 2024. All Rights Reserved.
Rising Kashmir > Blog > Politics > North India’s first Nuclear Plant coming up in Haryana: Dr Jitendra
Politics

North India’s first Nuclear Plant coming up in Haryana: Dr Jitendra

RK News
Last updated: February 19, 2023 12:41 am
RK News
Published: February 19, 2023
Share
4 Min Read
SHARE
New Delhi, Feb 18 : Union Minister of State Dr Jitendra Singh said North India’s first Nuclear Plant is coming up in Haryana in the town of Gorakhpur, which is about 150 km north of the national capital of New Delhi.
 
 He said during Prime Minister Narendra Modi’s regime, one of the major achievements would be the installation of Nuclear/ Atomic Energy plants in other parts of the country, which were earlier confined mostly to the South Indian States like Tamil Nadu and Andhra Pradesh or in the west in Maharashtra.
 
Dr. Singh said that this is keeping in line with the priority to increase India’s nuclear capacity, a number of path breaking decisions were taken in last over 8 years.  He added that a bulk approval of installation of 10 nuclear reactors has been given a nod by the Modi Government. 
 
The Minister said that the Department of Atomic Energy, GoI has also been given permission for forming joint ventures with PSUs for resources to opening up of atomic energy plants, which is an upcoming and promising sector, having potential to fulfil India’s all energy needs in times to come. 
 
Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP) having two units of 700 MWe capacity each of Pressurised Heavy Water Reactor (PHWR) indigenous design is under implementation near Gorakhpur village in Fatehabad district in Haryana. 
 
“Till date, an amount of ₹4,906 Cr has been spent out of total allocated funds 20,594 Cr with total Financial progress is 23.8% as on date.”
 
The minister said construction of other Main Plant buildings/structures viz. Fire Water Pump House (FWPH), Safety Related Pump House (SRPH), Fuel Oil storage area-1&2 (FOSA-1&2), Ventilation stack, overhead tank (OHT), Switchyard Control Building, Safety related & Non-safety related Tunnel & Trenches, Retaining walls and Garland Drain is progressing well.
 
He said ground improvement in Turbine Building -1 & 2, 220 kV Switchyard and IDCT-1A is completed. 
 
“Ground improvement in other areas IDCTs, 400kV Switchyard, Emergency makeup water pond and station roads are in progress, he informed adding that the contractors for the IDCT package and Turbine Island Package have mobilized the site.
 
It was further revealed that the purchase orders for major long manufacturing cycle equipment/components like Primary Coolant Pumps, Calandria, Reactor Headers, Refuelling Machines Heads, Moderator and other D20 Heat Exchangers, etc. are already in place.
 
” End Shields and all Steam Generators for the first unit have been received at site. Manufacturing of other equipment is in various stages and delivery at site is expected well in time to meet the construction schedule”.
 
Minister further informed that construction of Water Duct from Tohana to GHAVP for meeting operational cooling water requirements has been taken up through Haryana Irrigation & Water Resources Department (HI&WRD) as deposit work and progressing well.
 
BJP slams Bilalwal’s remarks: ‘Remember 1965, 1971 & Kargil’
BJP failed to ensure dev, employment: Bhalla
Will make Sonamarg as premier winter sports destination: MLA Sadiq
Several political workers, youth from Lolab join PC
Lok Janshakti Party urges Omar Abdullah to include MLAs of Jammu region in govt cabinet

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Copy Link Print
Previous Article People realised how Article 370 protected JK: Mehbooba
Next Article J&K on path of unprecedented socio- economic development under PM Modi’s visionary leadership: Pashupati Kumar
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

1MFollowersLike
262kFollowersFollow
InstagramFollow
234kSubscribersSubscribe
Google NewsFollow

Latest News

Youth’s body recovered after four days from Jhelum
Breaking Kashmir
May 29, 2025
Trump reinstates
US Court blocks Trump’s major tariffs, citing overreach of authority, not legally justified
Breaking World
May 29, 2025
Two Hybrid LeT Terrorists Apprehended In Shopian
Breaking Jammu and Kashmir News
May 29, 2025
Elon Musk steps down from Trump administration
Breaking World
May 29, 2025

Recent Posts

  • Youth’s body recovered after four days from Jhelum
  • US Court blocks Trump’s major tariffs, citing overreach of authority, not legally justified
  • Two Hybrid LeT Terrorists Apprehended In Shopian
  • Elon Musk steps down from Trump administration
  • Tourism comes to grind halt in Sonamarg after Pahalgam terror attack

Recent Comments

  1. BASHIR AHMAD BHAT on Poor hotel accommodation, lack of medical facilities irk Kashmiri pilgrims in Saudi Arabia, video goes viral
  2. sree vishnu movies on Pahalgam attack shatters Kashmir’s film tourism revival
  3. SavePlus on AI and Behavioural Analytics in Gaming: Making the World of Gaming Better
  4. Parul on Govt acknowledges faulty streetlights on Narbal-Tangmarg road
  5. dr gora on Women Veterinarians and the Goal of Viksit Bharat

Contact Us

Flat No 7,Press Enclave, Srinagar, 190001
0194 2477887
9971795706
[email protected]
[email protected]

Quick Link

  • E-Paper
  • About Us
  • Contact Us

Top Categories

Stay Connected

1.06MLike
262.5kFollow
InstagramFollow
234.3kSubscribe
WhatsAppFollow
Rising KashmirRising Kashmir
Follow US
© 2025. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?