Srinagar, March 15: According to the Chief Engineer, Distribution, KPDCL, in order to carry out installation of DTR structure & Laying of LT Cable under RDSS, the shutdown of 33KV Habak-Zakura-Burzuhama line shall be observed due to which 33/11KV Receiving Stations at Zakura & Burzuhama shall remain off while power supply to Zakura, Batpora, Gulab bagh, Danihama, Khimber, Chaterhama, Teilbal, Burzuhama, Gassu, Shoperbagh & Rahbagh areas will be affected from 10:30 AM to 04:00 PM on 17 March, 2025.
Similarly, to carry out laying of LT Cable under RDSS, the shutdown of 33KV Habak-Lal Bazar line shall be observed due to which 33/11KV Receiving Stations at Lal Bazar & Bagwanpora shall remain off while power supply to the Lalbazar, Molvistop, Botashah Mohalla, Sikhbagh, Amdakadal, Botakdal & Baghwanpora areas will be affected from 10:00 AM to 02:00 on 17 March, 2025.