Rising KashmirRising KashmirRising Kashmir
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search

Archives

  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Anchor
  • Breaking
  • Business
  • City
  • Developing Story
  • Editorial
  • Education
  • Features
  • Health
  • Interview
  • Jammu
  • Jammu and Kashmir News
  • Kashmir
  • Kashmir Tourism
  • Kath Bath
  • National
  • Opinion
  • Politics
  • Sports
  • Technology
  • Top Stories
  • Trending
  • Uncategorized
  • Video
  • Viewpoint
  • World
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Successful train runs on Katra-Reasi track bring rail closer to Kashmir
Share
Notification Show More
Font ResizerAa
Rising KashmirRising Kashmir
Font ResizerAa
  • Home
  • Top Stories
  • News
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Follow US
© 2024. All Rights Reserved.
Rising Kashmir > Blog > Breaking > Successful train runs on Katra-Reasi track bring rail closer to Kashmir
Breaking

Successful train runs on Katra-Reasi track bring rail closer to Kashmir

Agencies
Last updated: December 25, 2024 8:42 pm
Agencies
Published: December 25, 2024
Share
3 Min Read
SHARE

As Kashmir is all set to get rail connectivity, Northern Railway is giving final touches to the groundwork.

As a part of the preparations a successful train run, comprising an engine and goods train, was conducted on the 17-kilometer Katra-Reasi track on Wednesday. “Another trial run of a tower wagon was also conducted on India’s first cable-stayed railway bridge at Anji Khad, which is part of the USBRL (Udhampur-Srinagar-Baramulla Rail Link) project,” a senior Northern Railway official told news agency—Kashmir News Observer (KNO).

“The engine trial train ran at 30 km/h, and the goods train at 20 km/h. The trial will continue until the final inspection,” he added.

Another official, who is also part of the train operations on the USBRL project, said that the speed of the engines will be increased in future. “Very soon electric engines will also chug on this line,” he added.

Union Minister for Railways, Ashwini Vaishnaw, posted on X: “Trial run of tower wagon on India’s First Cable-Stayed Railway Bridge at Anji Khad for USBRL Project in J&K.”

While giving the details of the upcoming railway operations on the Udhampur-Srinagar-Baramulla Rail Link officials told KNO that from January 5 to January 6, 2025, statutory inspections will be conducted for the opening of the Katra-Reasi (16.501 km) section. “This section is part of the Udhampur-Srinagar-Baramulla New Broad Gauge (B.G.) Rail Link Project. The inspection will start at 20:50 hrs on January 5 and conclude at 07:55 hrs on January 6,” they added.

The Commissioner of Railways Safety (CRS) is expected to submit an inspection report to the Union Government on January 8.

Its in place to mention here that the Phase-I of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) Project, covering the 118-km-long Qazigund-Baramulla section, was inaugurated in October 2009. Subsequent phases included the inauguration of the 18-km-long Banihal-Qazigund section in June 2013 and the 25-km-long Udhampur-Katra section in July 2014.

In February, the first electric train trial run on the Banihal-Katra section of the USBRL project was successfully conducted on approximately 40 km of track and tunnels between Banihal and Sangaldan Railway Stations in Ramban district.

The USBRL Project involves 38 tunnels with a combined length of 119 km. The longest tunnel, T-49, measures 12.75 km, making it the country’s longest transportation tunnel. The project also includes 927 bridges with a combined length of 13 km.

Among these is the iconic Chenab Bridge, with an overall length of 1,315 m, an arch span of 467 m, and a height of 359 m above the riverbed. This bridge stands about 35 meters taller than the Eiffel Tower and is recognized as the world’s highest arch railway bridge—(KNO)

India, EU to coordinate within Global Partnership on Artificial Intelligence
Man dies of electrocution in Budgam, locals allege negligence by PDD
PM Modi’s vision for J&K has youth in its focus: BJP leader Nirmal Singh
Srinagar, some other places in Kashmir wakes to thin layer of snow
Unveiling the artistic tapestry of Kashmir- G20 delegates enthralled by handicrafts
TAGGED:Jammu and KashmirKashmirKashmir trainKatra-Reasi railTrial run

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Copy Link Print
Previous Article Fire devastates house in Gursai village in J&K’s Poonch; residents seek help
Next Article Taps, pipelines freeze amid bone-chilling cold in Kashmir
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

1MFollowersLike
262kFollowersFollow
InstagramFollow
234kSubscribersSubscribe
Google NewsFollow

Latest News

Srinagar Police sets up helpline for students and residents stranded in Iran
Breaking City
June 15, 2025
Indian Embassy in Iran issues helpline numbers, Telegram link for Indian nationals
Breaking National World
June 15, 2025
Over 1,000 cyclists participate in “Cyclothon, Pedal for Peace” in Srinagar
Breaking Sports
June 15, 2025
PM Modi made clear India’s blood is not meant to be shed: Amit Shah
Breaking National
June 15, 2025

Recent Posts

  • Srinagar Police sets up helpline for students and residents stranded in Iran
  • Indian Embassy in Iran issues helpline numbers, Telegram link for Indian nationals
  • Over 1,000 cyclists participate in “Cyclothon, Pedal for Peace” in Srinagar
  • PM Modi made clear India’s blood is not meant to be shed: Amit Shah
  • Parents of Students Stranded in Iran files Peacefull protest in Srinagar

Recent Comments

  1. Shah on Relief for Employees: J&K Bank Fixes EMI-Credit Mismatch, says JK Bank Chairman
  2. Latif khan on Why Kashmir needs Stronger Private Healthcare and Health Insurance
  3. Sameer farooq mir on Qazi Irfan assumes charge as RTO Kashmir
  4. Captain Vikrama on CM Omar Abdullah hails historic feat as three Kashmiri Girls crack IIT-JEE Advanced
  5. BASHIR AHMAD BHAT on Poor hotel accommodation, lack of medical facilities irk Kashmiri pilgrims in Saudi Arabia, video goes viral

Contact Us

Flat No 7,Press Enclave, Srinagar, 190001
0194 2477887
9971795706
[email protected]
[email protected]

Quick Link

  • E-Paper
  • About Us
  • Contact Us

Top Categories

Stay Connected

1.06MLike
262.5kFollow
InstagramFollow
234.3kSubscribe
WhatsAppFollow
Rising KashmirRising Kashmir
Follow US
© 2025. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?