Rising KashmirRising KashmirRising Kashmir
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search

Archives

  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Anchor
  • Breaking
  • Business
  • City
  • Developing Story
  • Editorial
  • Education
  • Features
  • Health
  • Interview
  • Jammu
  • Jammu and Kashmir News
  • Kashmir
  • Kashmir Tourism
  • Kath Bath
  • National
  • Opinion
  • Politics
  • Sports
  • Technology
  • Top Stories
  • Trending
  • Uncategorized
  • Video
  • Viewpoint
  • World
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: PM Modi’s visit to J&K on April 19 to inaugurate Vande Bharat Train postponed
Share
Notification Show More
Font ResizerAa
Rising KashmirRising Kashmir
Font ResizerAa
  • Home
  • Top Stories
  • News
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Follow US
© 2024. All Rights Reserved.
Rising Kashmir > Blog > Breaking > PM Modi’s visit to J&K on April 19 to inaugurate Vande Bharat Train postponed
Breaking

PM Modi’s visit to J&K on April 19 to inaugurate Vande Bharat Train postponed

Agencies
Last updated: April 15, 2025 10:14 pm
Agencies
Published: April 15, 2025
Share
3 Min Read
SHARE

Prime Minister Narendra Modi’s scheduled visit to Jammu and Kashmir on April 19 for the inauguration of the much-awaited Vande Bharat Express from Katra to Srinagar has been postponed, officials said on Monday.

Officials told that the PM’s visit to inaugurate the Vande Bharat Express on a stretch of the Udhampur-Srinagar-Baramulla Rail Link (USBRL), a 272-km-long mega railway project, has been postponed.

Preparations were already underway for the high-profile visit, with mock drills and trial runs being conducted on the USBRL section.

Speaking to KNO, Chief Area Manager (CAM) Kashmir, Saqib Yousuf Yatoo (IRTS), confirmed the postponement of the PM’s visit, stating that no fresh date has been announced yet.

The Vande Bharat Express, specially designed to operate in sub-zero temperatures of the Kashmir Valley, is already stationed at Katra. The train consists of eight fully air-conditioned coaches equipped with cab heating, HVAC systems with 9kW heating capacity, sealed gangways, infotainment displays, CCTV surveillance, LED lighting, mobile charging ports, automatic plug doors, and electro-pneumatic brakes.

Although the train is capable of running at speeds up to 160 km/h, it will operate at a limited speed of 85 km/h between Katra and Srinagar, as per the Commissioner of Railway Safety (CRS) approval.

Officials said the journey will reduce travel time between the two cities to just three hours, compared to the current 6–7 hours by road.

The USBRL project spans 272 km and includes 119 km of tunnels. It connects major areas including Udhampur, Reasi, Ramban, Anantnag, Pulwama, Budgam, Srinagar, and Baramulla. Two iconic engineering marvels—the Chenab Bridge, the world’s highest railway bridge, and the Anji Khad Bridge, India’s first cable-stayed railway bridge—are part of this ambitious project.

The Chenab Bridge stands at 467 meters, making it 35 meters taller than the Eiffel Tower. Officials revealed that around 29,000 tonnes of steel were used in its construction. Designed to withstand earthquakes up to magnitude 8, the bridge posed significant engineering challenges due to its location in a high-seismic zone.

Approved in 1994–95 and declared a National Project in 2002, the USBRL has been completed in phases. Key sections such as Qazigund–Baramulla (2009), Banihal–Qazigund (2013), Udhampur–Katra (2014), and Banihal–Sangaldan (2020) have already been commissioned. A trial run of MEMU trains was also successfully conducted last year on the electrified Reasi–Sangaldan section.

Currently, train services in the Valley are operational only on the Sangaldan–Baramulla section, while long-distance trains terminate at Katra—(KNO)

Art Exhibition celebrating Kashmiri Culture inaugurated at Govt Arts Emporium, Srinagar
Landslide win of PM Modi’s BJP in Gujarat grabs global headlines
Police arrests notorious drug peddler in Anantnag
Sentry opens fire after observing suspicious movement in Udhampur: Police
Exchange of fire reported along LoC in J-K’s Poonch

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Copy Link Print
Previous Article 11 Passengers injured as tempo skids off the road in Udhampur
Next Article Over 6.7 lakh visitors throng Tulip Garden in 20 days
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

1MFollowersLike
262kFollowersFollow
InstagramFollow
234kSubscribersSubscribe
Google NewsFollow

Latest News

Tourism comes to grind halt in Sonamarg after Pahalgam terror attack
Kashmir
May 29, 2025
SKUAST-K to establish advanced reproductive biotechnology centre to enhance animal breeding
Kashmir
May 29, 2025
DC calls for intensified action against drug abuse at NCORD review in Gbl
Kashmir
May 29, 2025
Shikara operators continue to ignore mandatory safety protocols
City
May 29, 2025

Recent Posts

  • Tourism comes to grind halt in Sonamarg after Pahalgam terror attack
  • SKUAST-K to establish advanced reproductive biotechnology centre to enhance animal breeding
  • DC calls for intensified action against drug abuse at NCORD review in Gbl
  • Shikara operators continue to ignore mandatory safety protocols
  • IUST partners with government for building safer J&K

Recent Comments

  1. BASHIR AHMAD BHAT on Poor hotel accommodation, lack of medical facilities irk Kashmiri pilgrims in Saudi Arabia, video goes viral
  2. sree vishnu movies on Pahalgam attack shatters Kashmir’s film tourism revival
  3. SavePlus on AI and Behavioural Analytics in Gaming: Making the World of Gaming Better
  4. Parul on Govt acknowledges faulty streetlights on Narbal-Tangmarg road
  5. dr gora on Women Veterinarians and the Goal of Viksit Bharat

Contact Us

Flat No 7,Press Enclave, Srinagar, 190001
0194 2477887
9971795706
[email protected]
[email protected]

Quick Link

  • E-Paper
  • About Us
  • Contact Us

Top Categories

Stay Connected

1.06MLike
262.5kFollow
InstagramFollow
234.3kSubscribe
WhatsAppFollow
Rising KashmirRising Kashmir
Follow US
© 2025. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?