Rising KashmirRising KashmirRising Kashmir
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search

Archives

  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Anchor
  • Breaking
  • Business
  • City
  • Developing Story
  • Editorial
  • Education
  • Features
  • Health
  • Interview
  • Jammu
  • Jammu and Kashmir News
  • Kashmir
  • Kashmir Tourism
  • Kath Bath
  • National
  • Opinion
  • Politics
  • Sports
  • Technology
  • Top Stories
  • Trending
  • Uncategorized
  • Video
  • Viewpoint
  • World
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Three years & counting, Handwara twin bridges still incomplete
Share
Notification Show More
Font ResizerAa
Rising KashmirRising Kashmir
Font ResizerAa
  • Home
  • Top Stories
  • News
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Search
  • Home
  • Top Stories
  • News
    • Kashmir
    • City
    • Jammu
    • Politics
  • Health
  • Anchor
  • Features
  • Interview
  • Video
Follow US
© 2024. All Rights Reserved.
Rising Kashmir > Blog > Kashmir > Three years & counting, Handwara twin bridges still incomplete
Kashmir

Three years & counting, Handwara twin bridges still incomplete

Residents fear Gandabal tragedy repeat due to incomplete bridges

Aatif Qayoom
Last updated: June 15, 2024 1:39 am
Aatif Qayoom
Published: June 15, 2024
Share
4 Min Read
SHARE

Handwara, June 14: The residents of Batagund, Mawar, and Langate in Handwara are increasingly anxious about the potential for a Gandabal-like tragedy, as the twin bridges “Daand Kadal” (Bulls Bridge) in Langate and the Batagund Bridge remain inoperative after being washed away three years and one year ago, respectively. The situation forces locals to perilously cross the fast-flowing Nallah Mawar.
According to local residents, the Batagund Bridge was damaged three years ago and subsequently closed to vehicular and pedestrian traffic. Although the administration at the time assured prompt restoration, the bridge remains incomplete three years later.
Executive Engineer of the R&B Division Langate, Gulzar Ahmad, assured that work on the Batagund Bridge is ongoing and it will be made motorable within the next two months, with completion expected by November this year. Regarding the iconic Daand Kadal in Langate, Ahmad stated that there is currently no plan for it but efforts are being made to include it in a future project.
Meanwhile, locals allege that despite some initial work by the contractor, the project has been abandoned. They claim that daily crossings over the Nallah Mawar pose significant risks, with two individuals having been injured in the past while traversing the damaged bridge. “Previously, people were able to cross the bridge, but the contractor damaged the slab of the already damaged bridge, posing a greater threat to those who walk over it,” a local resident stated, questioning why the slab was damaged if there were no immediate plans to complete the bridge.
Imtiyaz Ahmad, a resident, told Rising Kashmir that during the first few months after the bridge’s closure, they were unable to send their children to school on the other side. “Currently, we are risking our lives to send them to school. Either we have to keep them at home or take the risk to send them to school,” he lamented.
Similar grievances were voiced by the residents of Langate, who reported that despite promises of swift restoration following the bridge’s damage a year ago, no progress has been made. Although the R&B department issued tenders for repairs, the bridge remains in disrepair. “Our land is situated on the other side of the bridge, and we have no other option but to take long routes to reach our agricultural fields. A few minutes’ journey is taking hours,” said Aijaz Ahmad, a Langate resident.
The people in this area claim that the authorities in Kupwara district are waiting for a Gandabal-like incident before addressing the issue. They recall the Gandabal tragedy, where six people drowned due to the absence of a bridge over the river Jhelum, warning that a similar disaster could occur if the twin bridges are not completed soon.
The residents’ plea remains urgent: “If these bridges are not completed soon, we fear a repeat of the Gandabal tragedy,” they warn, urging the authorities to take immediate action.

LG pays tribute to former PM Lal Bahadur Shastri
Ensure timely snow clearance in remote areas: Div Com to BEACON
Vistadome train service on Budgam-Banihal route to begin from today
No delay in wage payments for casual, daily wagers: Rana
Govt plans action against unregistered doctors, unethical practices

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Copy Link Print
ByAatif Qayoom
Aatif Qayoom is a Senior Correspondent at Rising Kashmir, covering crime, tourism, sports, and various social issues across Jammu and Kashmir. Known for his accurate and ground-based reporting, he highlights stories that matter to people.
Previous Article Ahead of Yatra, ADGP Jmu reviews arrangements to ensure pilgrim safety
Next Article ADGP Jammu reviews arrangements for Amarnath Yatra, focus on safety and emergency response measures
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

1MFollowersLike
262kFollowersFollow
InstagramFollow
234kSubscribersSubscribe
Google NewsFollow

Latest News

Mughal Road Closed For Traffic After Fresh Snowfall at Peer Ki Gali
Breaking Jammu and Kashmir News
May 31, 2025
Trump reinstates
Trump bids farewell to Musk, assures DOGE will remain functional
Breaking World
May 31, 2025
How Big Tobacco Manipulates Minds and Markets?
Opinion
May 31, 2025
Biotechnology: Unlocking Tomorrow’s World, Today
Viewpoint
May 31, 2025

Recent Posts

  • Mughal Road Closed For Traffic After Fresh Snowfall at Peer Ki Gali
  • Trump bids farewell to Musk, assures DOGE will remain functional
  • How Big Tobacco Manipulates Minds and Markets?
  • Biotechnology: Unlocking Tomorrow’s World, Today
  • Kargil’s first MRI machine nears installation after timely LG intervention

Recent Comments

  1. BASHIR AHMAD BHAT on Poor hotel accommodation, lack of medical facilities irk Kashmiri pilgrims in Saudi Arabia, video goes viral
  2. sree vishnu movies on Pahalgam attack shatters Kashmir’s film tourism revival
  3. SavePlus on AI and Behavioural Analytics in Gaming: Making the World of Gaming Better
  4. Parul on Govt acknowledges faulty streetlights on Narbal-Tangmarg road
  5. dr gora on Women Veterinarians and the Goal of Viksit Bharat

Contact Us

Flat No 7,Press Enclave, Srinagar, 190001
0194 2477887
9971795706
[email protected]
[email protected]

Quick Link

  • E-Paper
  • About Us
  • Contact Us

Top Categories

Stay Connected

1.06MLike
262.5kFollow
InstagramFollow
234.3kSubscribe
WhatsAppFollow
Rising KashmirRising Kashmir
Follow US
© 2025. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?